· Case study · Mineluz
Change the way
you dig.
How a major copper operator used Mineluz to cut exploration costs by 35% while doubling target density.
The problem
Three years of seismic.
Three years of seismic.
Too slow to interpret.
The operator held 1.4 TB of post-stack seismic across a porphyry belt but had interpreted only 9% of it before rigs were due. Manual picking was the bottleneck.
mineluz.case ~ baseline
# baseline metrics (12-mo trailing) interpreted: 9% of corpus fault_picking: 142 days / survey rig_success: 38% cost_per_target: $1.2M
The result
Six months later.
0%
Lower cost per drilled target.
0×
Target density against the same footprint.
0 days
To first production-grade target map.