· Case study · Mineluz

Change the way
you dig.

How a major copper operator used Mineluz to cut exploration costs by 35% while doubling target density.

The problem

Three years of seismic.
Too slow to interpret.

The operator held 1.4 TB of post-stack seismic across a porphyry belt but had interpreted only 9% of it before rigs were due. Manual picking was the bottleneck.

mineluz.case ~ baseline
# baseline metrics (12-mo trailing)
interpreted:      9% of corpus
fault_picking:    142 days / survey
rig_success:      38%
cost_per_target:  $1.2M
      
The result

Six months later.

0%
Lower cost per drilled target.
Target density against the same footprint.
0 days
To first production-grade target map.